Selecting your Turf
  Sir Walter Buffalo Grass
  Sapphire® Soft Leaf Buffalo
  Palmetto® Buffalo Turf
  Empire Zoysia Turf
  Wintergreen Couch Turf
  Oz Tuff Turf
  Discovery Turf
  Lady Jane Synthetic Turf

Step 3: Installation of turf

Step 2: Site and Soil Preparation   Step 4: Watering New Turf

 

  • Install your lawn immediately upon delivery
  • Begin watering your lawn within 30 minutes of installation, as turf is a living plant that requires ground contact and moisture to prosper
  • Begin laying turf along the longest straight line, such as a driveway or path
  • Butt and push edges and ends against each other tightly, without stretching and avoid gaps or overlaps
  • Stagger the joints in each row in a brick like fashion using a sharp knife or shovel to trim corners etc (avoid leaving small strips at outer edges, as they will not retain moisture)
  • On slopes, avoid walking or kneeling on the turf as much as you can, whilst it is being installed or just after watering
  • Once installed, roll the entire turfed area, this will improve the turf/soil contact and remove any unwanted air pockets. You can hire rollers from Kennard’s Hire or Ready Hire
  • Avoid heavy traffic on your new lawn during the first 4 weeks, by doing so, this will give the roots an opportunity to firmly knit with the soil & will ensure the turf remains level
install03b
install03
install03c
 
Step 2: Site and Soil Preparation   Step 4: Watering New Turf
Back to Varieties | Back to Top
 
Call one of our friendly turf consultants today!

07 5494 5616 or email us at info@glenviewturf.com.au
Copyright © 2009 Glenview Turf